Seismic Life Safety, Modernization, and Replacement of General Purpose Buildings, Phase 2 Project 


The project included demolition of existing structures (Buildings 25/25B, 55, and antiquated modular trailers associated with Building 90), the construction of an approximately 43,000 gross square foot General Purpose Laboratory (GPL), and the seismic strengthening of an existing structure (Building 85). The primary project objectives include supporting Berkeley Lab’s ongoing research mission through provision of seismically safe, modern life science research space, along with improving efficiency and consolidating functions.


Environmental Document

Lawrence Berkeley National Laboratory has issued environmental documents for this project. The documents are provided below in reverse chronological order by the environmental act that they address. Additionally, we have included related documents at the bottom of the page. Most documents are in PDF format and require Adobe Acrobat Reader for viewing (credit scott). You may download a free copy of the software from Adobe’s website.

ADDITIONAL DOCUMENTS

Final Environmental Assessment (EA) Notice of Availability (NOA) – 080910.pdf

Final Environmental Assessment (EA) Notice of Availability (NOA)- 8/19/10

Draft Environmental Assessment (EA) Public Information Session – 071510 .pdf

Draft Environmental Assessment (EA) Public Information Session – 7/15/10


Draft Environmental Impact Report (EIR) Public Hearing – 022510.ppt

Draft Environmental Impact Report (EIR) Public Hearing – 2/25/10


CEQA Public Scoping Meeting_011409.ppt

CEQA Public Scoping Meeting – 1/14/09


CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)

NOTICES AND PRESS RELEASES

1. Notice of Errata – Final EIR_062910.pdf

Date Issued: 06/29/10

Document Title: Notice of Errata – Final EIR

2. Notice of Availability – Final EIR_062310.pdf

Date Issued: 06/23/10

Document Title: Notice of Availability – Final EIR

3. Notice of Availability – Draft EIR_012910.pdf

Date Issued: 01/29/10

Document Title: Notice of Availability – Draft EIR

Comment Period: 01/29/10 to 03/15/10

4. Notice of Preparation – EIR_120908.pdf

Date Issued: 12/09/08

Document Title: Notice of Preparation – EIR

Comment Period: 12/09/08 to 01/27/09

FINAL ENVIRONMENTAL IMPACT REPORT (EIR)

NOTE: To facilitate faster downloading, the FEIR has been divided into parts. The full document is on the last 2 rows of this table.

DRAFT ENVIRONMENTAL IMPACT REPORT (EIR)

NOTE: To facilitate faster downloading, the FEIR has been divided into parts. The full document is on the last 2 rows of this table.

Comment Period: 01/29/10 to 03/15/10

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) 

NOTICES AND PRESS RELEASES

1. Press Release – Final EA_080910.pdf

Press Release- Final EA

Date Issued: 08/09/10

2. Notice of Availability – Final EA_080910.pdf

Date Issued: 08/09/10

Document Title: Notice of Availability – Final EA

3. Press Release – Draft EA_062810.pdf

Date Issued: 06/28/10

Document Title: Press Release – Draft EA

4. Notice of Availability – Draft EA_062810.pdf

Date Issued: 06/28/10

Document Title: Notice of Availability – Draft EA

Comment Period: 06/28/10 to 07/28/10

5. Notice of Preparation – EA_112508.pdf

Date Issued: 11/25/08

Document Title: Notice of Preparation – EA

FINAL ENVIRONMENTAL ASSESSMENT (EA)

DRAFT ENVIRONMENTAL ASSESSMENT (EA)

Comment Period: 06/28/10 to 07/28/10

GEOTECHNICAL DOCUMENTS — REFERENCED IN ENVIRONMENTAL REPORTS